答案:【计分规则】: the project at a zero percent required return is:NPV = $6,900The NPV at a 10 percent required return is:NPV = $3,189.78 The NPV at a 20 percent required return is:NPV = $417.13And the NPV at a 30 percent required return is:NPV = –$1,714.52